NCR Management
Record, investigate, and close Non-Conformance Reports raised by quality inspectors during audits and maintenance quality reviews.
Route
/dashboard/ncrs
Who raises NCRs
Quality Department, QA Managers
New NCR
/dashboard/forms/ncr
Regulatory ref
EASA Part-145.A.65 / Part-145.A.70
NCRs in Inspect Africa Pro are raised by quality personnel -- not automatically by the system. Every NCR must be reviewed and closed by an authorised quality manager. The full NCR history is included in the EASA audit export.
Workflow
Identify the non-conformance
During an audit, maintenance review, or document inspection, the quality inspector identifies a deviation from an approved procedure, standard, or regulation. Document the specific finding with enough detail to allow independent verification.
Raise the NCR
Navigate to Quality -- NCR Management and create a new NCR. Record the finding description, applicable ATA chapter or procedure reference, the person or area responsible, and the discovery date.
Reference the applicable standard
Identify the specific regulation, approved procedure, or company exposition requirement that has not been met. This is required for root cause analysis and corrective action planning.
Root cause analysis
Assign the NCR to the responsible department. The assignee must document the root cause -- not just the symptom. Common root causes include inadequate training, unclear procedures, supervision failures, or tooling issues.
Corrective action
Record the corrective action taken to prevent recurrence. Set a target completion date. Corrective actions should address the root cause, not just the immediate finding.
Verify and close
The quality manager or delegated authority verifies that the corrective action has been implemented effectively before closing the NCR. Record the verification method and date. The closed NCR forms part of the audit trail exportable under EASA audit requirements.